Dust Mask Packing Machine

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2020-04-28 06:29

  • Browse the number:

    263

Send an inquiries

Company Profile

Ruian Lihong Machinery Co., Ltd

By certification [File Integrity]

Contact:lihong(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.lihongcn.com/ http://lihong.cn-useful.com/

Product details

Product Description

Dust mask packing machine

Model

GSB-220

Output

30-120pcs/min

Packing size

L 60-280mm, W 60-200mm,

H 1-10mm

Compressor

≥0.1m3/min

Voltage

AC 380V 60HZ(customized)

Power

7KW

Weight

2000kg

Dimension

L*W*H

5730×1660×1430㎜


Our Service

1. All XZB, GSB series pillow packing machines (foreign countries Customer) From the date of shipment, the warranty period is one year, and a lifetime paid service is provided outside the warranty period.

2. During the warranty period, if there is a quality problem, all replacement parts and supporting parts will be free of charge.

3. Customers outside the warranty period need our company to send technicians to repair or replace parts and supporting parts. Our company provides cost and price concessions.

4. If the customer encounters a problem during use, our company will solve it for the customer as soon as possible after receiving the notification. Under the premise that it cannot be resolved over the phone, our company will reach the customer's production in the shortest time after receiving the notification of sending someone. Carry out repairs on site (except for force majeure factors).

5. Our company is responsible for commissioning, installing, training operation and maintenance personnel for customers (foreign countries).

6. The warranty period of the equipment is twelve months, counting from the date when both parties sign the final acceptance report.


Payment:

1.After signing the contract, the buyer will pay 30% of the total contract price by T/T, and arrange production after receiving the deposit.

2. 60% of the contract amount shall be paid by T/T payment after the goods have passed the inspection and acceptance.

3. Arrange shipment within 7 working days after all payment is received.


Technical Guidance Fee Standard:

1. Air tickets, accommodation and meals are paid by the buyer.

2. The fee for commissioners is $120 per person per day.

3. The buyer may arrange personnel to study at the seller's site. The seller is responsible for training operators and maintenance personnel.


Machine Introduction

GSB-220 four side packing machine is specialized in packing plaster, dust mask, disposable mask, glove, napkin,fever cooling patch,warm paste, hotel supplies and etc.

This machine is special design to pack path and plaster products, in strict accordance with the "GMP" requirements specification. It is an automatic online machine with material auto feeding(optional), coding, four side sealing, easy tear punch and bag making. The machine adopts the touch screen control for easy operation, servo motor control for accuracy, EPC, six group temperature controller and auto feed for free adjustable. This machine save lots labor, it is an ideal machine for plaster packing.


Packaging Sample Display


Equipment Size Chart

FAQ

1. How long is your machine's warranty period?

All our machine have one year guarantee for electricity parts and one year guarantee for mechanism, starting from finished installation.


2. How could you do if the parts broken within warranty?

We would express the free replacement parts during the warranty date.


3. Does your engineer understand English?

Our engineers understand a little English. All our engineers have more than five years machine installation experience. In addition, they can use body language to communicate with customer.


4. Can you help us find any engineer in our location?

Of course, we will check and inform you as soon as possible.


5. How do we solve the machine problem ?

Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.


http://www.lihongcn.com/